Components of fastening of the inlet pipeline
1 - Support bracket; 2 - Gasket; 3 - Hairpin; 4 - Inlet pipeline
1. Remove the air intake sleeve and air cleaner cover assembly (see Section Removal and installation of components of an inlet air path).
2. Remove PCV hose (between intake manifold and cylinder head cover) from the side of the intake pipe.
3. Turn out a bolt of fastening of a basic arm (1 in the illustration above).
4. Give nuts and bolts in the reverse order shown in the illustration Intake manifold tightening sequence.
Intake manifold tightening sequence
Giving nut No. 5
Note. No. 6 in the illustration Intake manifold tightening sequence when removing the semantic load does not carry; Loosening and tightening of #5 and #4 nuts can be facilitated by inserting the wrench into the corresponding slots (2 in the illustration Giving nut No. 5).
5. Remove the inlet pipeline.
6. Installation is carried out in the reverse order. Pay attention to the cleanliness and flatness of the mating surfaces. Tighten fasteners in the sequence indicated in the illustration Intake manifold tightening sequence.
Note. No. 6 in the illustration Intake manifold tightening sequence indicates re-tightening of #1 bolt.